Enbridge Pipelines – Line 3 DRA Skid Installations (2017)

Centec was again awarded the DRA Skid Installation project as the General Contractor at two Manitoba locations (St Leon and Glenboro) and one Saskatchewan location (Bethune).  Centec was again responsible for Civil, Electrical and Mechanical work which also included Structural, Piping, Controls and Instrumentation.  The evaluation score conducted this time at the end of the project by Enbridge was 80.74%.